Andre's Agora
Home Up

 

  Phase 2: End of 2002

07/09/07

Up
Phase 1: Fall 2002
Phase 2: End of 2002
Phase 3: March & April 2003
Phase 4: May & June 2003

 


 
 

Opening for stairs from upper floor with temporary wooden stairs

 

Temporary wooden stairs

 

Kitchen with wall for separation

 

Living room with window doors to balcony

 

Installation for lower floor toilets

 
 

Lower florr south window and toilet installation

 

Living room with ALBA bricks for separation wall

 

Parents sleeping room with ALBA bricks for the separation to the dressing

 

Upper floor without walls for the rooms of the children

 

Parents sleeping room with no front wall

 
 

Lower floor toilet with door frame in metal

 

Entry door with left the stairs for upper floor and right the kitchen

 

Upper floor with door frames in metal

 

Upper floor corridor to be build with all door frames in metal

 

Parent sleeping room with door frame in metal

 
 

Upper floor corridor to be build with door frames in metal

 

Upper floor corridor partially with walls

 

Rebecca's room

 

Parent's sleeping room with corridor wall and door frame

 

Fourth room on upper floor with partial wall

 
 

Upper floor corridor with partial walls

 

Lower floor glass brick door replacement

 

Living and dining room

 

Dining and living room

 

View from balcony windows (primary school of the Vélodrome)

 
 

Upper floor corridor with the arc supporting the roof

 

Living room with its separation wall

 

Rebecca and Aileena behind living room separation wall

 

Living room separation wall and stairs

 

Living room with separation wall

 
 

Kitchen

 

Stairs to upper floor

 

Upper floor corridor balcony

 

Lower floor corridor between entry and office room and with glass bricks

 

Lower floor toilets, shower, and dressing

 
 

Lower floor corridor with glass bricks

 

Lower floor toilets and shower

 

Upper floor corridor with shower and bath room

 

Living with separation wall

 

Living with view into office room

 
 

Parent's sleeping room with separation wall to the dressing

 

Parents sleeping room with door frame

 

Upper floor bathroom

 

Upper floor corridor with Aileena

 

Upper floor fourth room

 
 

Aileena's room

 

Aileena's room

 

Upper floor fifth room

 

Rebecca's room

 

Upper floor corridor

 
 

Stairs from upper floor with entry

 

Home | Phase 1: Fall 2002 | Phase 2: End of 2002 | Phase 3: March & April 2003 | Phase 4: May & June 2003

This site was last updated 05/14/05